1st October 2023
ENABLING WORKS – OCTOBER 2023
This month has seen the commencement of the demolition phase of the development on the four titled adjacent lots. The site includes all lots along Louise Street immediately South of the beautiful Rose Gardens in Nedlands down to Jenkins Avenue.
1. Demolition Sequencing
The development is to occur over two stages with Stage (1) offering a choice of 33 one, two and three-bedroom Luxury Apartments and 3 Penthouse Residences to be located over 5 levels on 17 - 19 Louise St. Stage (2) will include a selection of just 6 Boutique Apartments which will be constructed on 21 Louise Street and 7 two - storey townhouses that will be constructed 23 Louise St.
The current house located on 23 Louise St has been set aside to provide a site office during the construction phase of Stage (1). The house on 21 Louise St will be demolished to provide a set down area for Stage (1) construction.
2. Temporary Fencing Installed
For the safety and security of the site, temporary fencing has been installed around the perimeter. This not only helps to protect the construction area but also ensures that unauthorized individuals stay clear of the ongoing work. It’s an important measure to keep both the construction team and the surrounding community safe as we move forward.
3. Demolition Commences - Stage One (17 - 19 Louise St)
We have officially started demolition process on 17 - 19 Louise St, a major step toward preparing the land for new construction. The Old houses are being carefully dismantled, and we’ve implemented dust and noise control measures to minimize any disruption to nearby properties. Clearing the site is essential to making way for the new apartment complex on this site, and the process is proceeding on schedule.